Search Results for: construction

Edinburgh and Manchester top UK’s regional commercial property markets

With 2015 set to be a ‘stellar year’ for regional city growth, commercial property adviser GVA has compiled key statistics on Grade A office markets for the top nine UK cities. Manchester and Edinburgh topped the charts in terms of Grade A take-up in 2014, on 401,406 sq ft and 333,351 sq ft respectively, while Newcastle was at the bottom on 64,000 sq ft, just behind Liverpool on 67,199 sq ft. Edinburgh and Glasgow led the way in terms of immediately available space and Edinburgh also saw the largest leasing transaction in 2014 with the 108,564sqft deal signed by Standard Life Investment. Manchester (614,000) and Leeds (487,650 sq ft) top the heap in terms of Grade A space under construction. Meanwhile Manchester and Birmingham top the prime rent pile at £32 and £30 per sq ft for prime Grade A space respectively.

More →

BREEAM consults on new scheme for refurbishment and fit-out projects

Newham CC new officesA draft of the part of the BREEAM sustainability assessment schemes which deals with refurbishment and fit-Out, has been published for consultation. Launched this week at MIPIM, the consultation will close on 10 April 2015. The draft document can be downloaded from the BREEAM website here. All interested parties, buildings owners and investors, designers, construction industry professionals, BREEAM assessors and other stakeholders are invited to send their comments to breeam@bre.co.uk with the subject: “Comments on draft BREEAM International RFO 2015”. The draft publication of of the scheme comes four months after the launch of the UK Refurbishment and Fit-Out 2014 scheme. BRE claims that this has been adapted for an international market to take account of a range of local and regional standards, conditions and climates.

More →

Best performing office buildings included in the annual BREEAM awards

Publication1A Grade A listed building at London’s King’s Cross; a former industrial warehouse complex in London’s Clerkenwell and an office building off Paris’ Champs-Elysées were among the award winners for best performing buildings assessed under sustainable buildings standard BREEAM. Over 50 green projects from across Europe were shortlisted with eight awards going to UK-based projects and four others shared equally between France and Norway. Winner of ‘offices new construction’ is One Pancras Square, a Grade A office building based at the gateway to the King’s Cross development. ‘Offices in use’ winner Washington Plaza is a 47,097 sq.m office building, at 42 rue Washington 75008 Paris. ‘Offices refurbishment and fit-out’ winner Morelands sits at the junction of Old Street and Goswell in London’s Clerkenwell area and comprises a cluster of warehouse buildings built around a U-shaped courtyard.

More →

Leading role for property sector in promoting ‘green infrastructure’ says UK-GBC

Key role for property sector in promoting 'green infrastructure' says UK-GBCThe property industry can play a leading role in protecting and enhancing national features and biodiversity. That is according to a new report by the UK Green Building Council Task Group which presents the business case for “green infrastructure”, the term used to describe natural and semi-natural features ranging from street trees and roof gardens to parks and woodland. Demystifying Green Infrastructure finds that introducing green infrastructure into the built environment offers a range of business opportunities, including an increase in the value of land and property, as well as social and environmental benefits. Aimed primarily at developers and occupiers, the report also identifies risks from failing to incorporate adequate green infrastructure into projects, such as delays in planning, increased costs and reputational damage.

More →

Job automation seen as a key digital challenge in new policy report

Whichever party or coalition forms the next UK Government will face a raft of serious challenges with the emerging digital economy, including making plans for the automation of up to a third of existing jobs. That is the main conclusion of a new report published this week by The House of Lords. Make or Break: The UK’s Digital Future, argues that the next 20 years will present the UK with a range of profound challenges and opportunities and it is incumbent on the Government to address them at the earliest opportunity. As well as imminent and well known  issues such as the need to roll out ultrafast broadband countrywide and the development of skills and digital clusters, the report also highlights the particular issue of what to do about the claim that up to 35 percent of jobs over the next two decades will be automated.

More →

Latest commercial buildings listings illuminate changing world of work

30 Cannon StreetThe latest fourteen buildings to be listed as part of the Post-War Commercial Buildings Project have been announced by the UK Government’s Department for Culture, Media and Sport. The project was initiated by English Heritage in 2011 as a way of recognising the significance and diversity of commercial buildings and acknowledging their unique proneness to change. According to English Heritage the latest fourteen Grade II listed entries (as well as a number of others assessed but deemed of lesser significance) also highlight how the design of commercial buildings reflected the changing world of work up to the cut off point of 1984. Although the projects are predominantly in the South East, there are listings for commercial buildings in Leeds, Newcastle-upon-Tyne and Birmingham.

More →

Good communication is essential to ensure workplace health and safety

health and safetyLast week the HSE marked its 40th anniversary with a series of warnings about the continuing importance of maintaining health and safety. While the number of people killed at work has fallen dramatically since the HSE was launched, it’s important employers don’t get complacent. A lack of education among the workforce about the adequate measures to take when considering health and safety can still make a huge difference. Good communication is vital, so provide in depth, yet cohesive and easy to follow Health and Safety guides, including useful information like fire blanket locations, fire exits, what to do in an emergency and emergency phone numbers which are handed out to all employees. Regular talks about the importance of health and safety should be conducted every few months to reiterate health and safety messages.

More →

New Hammersmith mixed-use scheme to accommodate 2,000 workers

mixed-use schemeLegal & General has appointed Land Lease Property to develop a £75 million mixed-use scheme on London’s Hammersmith Road. The development, designed by Sheppard Robson, will feature 242,000 sq ft of Grade-A office space over 10-storeys, which can house up to 2,000 workers. The office space has been designed to maximise natural daylight and features outdoor roof terraces. The entire 350,000 sq ft site retail frontage will be stepped back from Hammersmith Road, with a new landscaped plaza at the front that leads through to a podium garden. A business lounge and café will form part of the retail element, which totals 13,000 sq ft, to help enhance the public areas and encourage social interaction for workers. Construction is set to start in early January 2015 with completion expected in summer 2017.

More →

Availability of office space in Central London has fallen by half since 2009

Availability of office space in Central London has fallen by half since 2009The amount of available office space in Central London has fallen by almost half since 2009, new figures reveal. The latest end of year research by Deloitte Real Estate show that the availability of office space has fallen 14 per cent over the last 12 months, and warned that rents will probably rise by around six to over eight per cent as a result. In an analysis of the submarkets across the West End, Deloitte reports that Victoria has seen the greatest decline in available office space, falling 46 per cent in just 12 months. While the City of London market has not seen as dramatic a decline in available space, hovering around five million sq ft throughout 2014, it still remains at its lowest level for seven years. This is despite over 3 million sq ft of new office space completing construction during 2014 – a new high.

More →

We all need to embrace the opportunities presented by BIM

contemporary-reception-desk-66059-2171731Described as ‘key to growth in the sector’ by chief construction adviser, Peter Hansford and increasingly recognised as a much more collaborative and efficient way of working, Building Information Modelling (BIM) continues to gather supporters from across the industry, yet there is a percentage of people who are still keeping their heads down and hoping it will all just go away. Maybe it’s the required element of investment or maybe it’s the small matter of change itself – always a difficult one for the construction industry – but there is still an amount of SMEs who are shrinking away from BIM, despite the fact that it is destined to become the established way.

More →

Revised plans approved for development of iconic BBC Television Centre

Revised plans for former BBC television centre buildings approvedNew office space aimed at occupiers in the creative sector is included in Stanhope and Mitsui Fudosan’s planned redevelopment of the former BBC Television Centre in west London. The London Borough of Hammersmith and Fulham have granted planning permission for the revised plans for the mixed use development of the iconic building; to include the demolition of the existing Stage 4 and 5 office buildings and their replacement with a more sustainable and efficient new ten storey office building with improved facades, designed by architects AHMM. A change in use from residential to commercial has also been approved for a new nine storey office building fronting Hammersmith Park on the site of the old BBC restaurant block, with an overall increase in office accommodation across the site from 350,000 sq ft to 519,000 sq ft.

More →

We should bring the soft landings idea back to Earth with a bump

Soft landingsSoft landings, hit the ground running, smooth handover, transition phase: whatever words you choose to describe the process the principle is the same. Managers and occupiers of a building – any building, want it to function properly. But why is this apparently so hard for anybody to achieve? Soft landings feels more like tainted love right now. So, think back a few steps and imagine you’re buying a brand new, shiny new-build house. It doesn’t come with an instruction manual, but it is a house – what’s not to know about it. But even new homes have issues. Maybe cracking in plaster, gaps around architraves, doors not closing smoothly and heating systems that is noisy and untested. In the trade it’s called snagging. You call the builder up, you make a list he comes round your new house and checks the list and then argues about the repairs.

More →